Can you veterans take a look at this setup and tell me if it looks logical?
I am using the already machined bosses for the valve slide bearings as a datum.
This set up is so I can indicate off that surface and machine the inside and outside of the main bearings.
I am using the already machined bosses for the valve slide bearings as a datum.
This set up is so I can indicate off that surface and machine the inside and outside of the main bearings.