- Joined
- May 27, 2010
- Messages
- 2,999
- Reaction score
- 1,171
Hi Guys,
I am not sure by the time I finished above in a week if it will look like the attached foto. Gus refuse to pay S$500 to have same shipped by DHL from Japan.
Will be using whatever I have on hand and taking short cuts(good excuse --- "custom made by Gus to suit Gus".).Built cost extimated at S$20 w/o labour charge.Thats S$480 saved to buy milling cutters,hand tools,micrometer,DRO,Nano Lathe?? etc.
Very glad I have Makita Bandsaw to fight off procrastination. No more manual sawing with hacksaw.
Hopefully it won't be "Bush Engineering" as they called it in Aussie language.
Bush Engineer Gus.
I am not sure by the time I finished above in a week if it will look like the attached foto. Gus refuse to pay S$500 to have same shipped by DHL from Japan.
Will be using whatever I have on hand and taking short cuts(good excuse --- "custom made by Gus to suit Gus".).Built cost extimated at S$20 w/o labour charge.Thats S$480 saved to buy milling cutters,hand tools,micrometer,DRO,Nano Lathe?? etc.
Very glad I have Makita Bandsaw to fight off procrastination. No more manual sawing with hacksaw.
Hopefully it won't be "Bush Engineering" as they called it in Aussie language.
Bush Engineer Gus.
Last edited: